INDUSTRIES
Progress billing for every specialty trade
Every trade bills differently: stored gear, phased rough-in, pours, fabrication or finishes. DrawPrep keeps your schedule of values, change orders and backup in one place so each pay application is checked before it goes out.
Choose your trade
Electrical
Gear lead times, stored switchgear and phased rough-in and trim.
Billing for ElectricalMechanical & HVAC
Equipment deliveries, ductwork phases and start-up and balancing.
Billing for Mechanical & HVACPlumbing
Underground, rough-in, fixtures and inspections by phase.
Billing for PlumbingFire protection
Design, sprinkler mains, branch lines, heads and testing.
Billing for Fire protectionDrywall & framing
Floor-by-floor progress across framing, board, tape and finish.
Billing for Drywall & framingConcrete
Footings, foundations, slabs and pours tied to the schedule.
Billing for ConcreteSteel & metals
Shop drawings, fabrication, delivery and erection.
Billing for Steel & metalsRoofing & waterproofing
Membranes, flashing, warranties and weather-driven schedules.
Billing for Roofing & waterproofingPainting & finishes
Prime, finish coats and punch-list work across areas.
Billing for Painting & finishesFlooring
Material orders, prep, install by area and final protection.
Billing for FlooringWhat every trade gets
SOV import
Bring your schedule of values in from CSV or a spreadsheet.
Pre-submission checks
Catch missing values, retainage changes and missing attachments.
Change orders
Approved changes become SOV lines and update contract totals.
Ready packages
G702/G703-style PDFs with your supporting documents attached.
Common questions
- Which trades does DrawPrep support?
- DrawPrep is built for specialty trade subcontractors who bill monthly against a schedule of values, including electrical, mechanical, plumbing, fire protection, drywall, concrete, steel, roofing, painting and flooring.
- Does DrawPrep submit pay applications to the GC?
- No. DrawPrep prepares and checks your package; you send it through the process your GC requires.
- Are the forms official AIA documents?
- No. DrawPrep produces G702/G703-style summaries and continuation sheets. Use official forms when your contract requires them.
YOUR NEXT BILLING PERIOD
Put the paperwork in one place.
Keep the project, the progress and the package together.