Pay application software for concrete subcontractors
DrawPrep helps concrete subcontractors organize footings, walls, slabs and flatwork into a schedule of values and prepare G702/G703-style pay applications, with pour records and change orders kept alongside each period.
Billing challenges in concrete
Front-loaded schedules
Concrete work often lands early, so large billings happen in the first periods and retainage builds quickly.
Pour-based progress
Progress follows pours by area. Clear area-based lines make it simple to show what was placed.
Quantity changes
Unforeseen conditions can change quantities. Approved changes need to be reflected before billing.
Example schedule of values
Illustrative only. Use the breakdown your contract and GC require.
| Item | Description |
|---|---|
| 01 | Footings |
| 02 | Foundation walls |
| 03 | Slab on grade — area A |
| 04 | Slab on grade — area B |
| 05 | Elevated decks |
| 06 | Site flatwork & curbs |
How DrawPrep fits
- Retainage tracked across every period
- Change orders for quantity adjustments
- Billing history for long retainage tails
Concrete billing questions
- Why does retainage matter so much for concrete subcontractors?
- Concrete work is often finished early, while retainage may be held until much later in the project. A clear history makes the held amount easy to follow.
- Should slabs be split by area?
- Splitting by pour area or level makes progress easier to verify and bill accurately.
- Can DrawPrep track retainage on this kind of job?
- Yes. You set the retainage rate the contract requires, and each pay application carries it forward and flags a rate that changes between periods so you can confirm it before sending.
Related trades
DrawPrep prepares billing packages; it does not submit them, guarantee GC approval or provide legal advice. Confirm stored-material and retainage terms in your contract.