Pay application software for drywall and framing subcontractors

DrawPrep helps drywall and metal framing subcontractors track progress by floor and operation and prepare G702/G703-style pay applications. Change orders for added walls or rework become schedule-of-values lines once approved.

Billing challenges in drywall & framing

Many repeating lines

Framing, board, tape and finish per floor quickly creates a long SOV. Line-level math keeps it accurate.

Rework and backcharges

Damage and late design changes create extra work. Track approved changes separately from base scope.

Labor-heavy billing

With mostly labor, percent complete is the main figure a GC reviews, so consistent measurement matters.

Example schedule of values

Illustrative only. Use the breakdown your contract and GC require.

ItemDescription
01Metal stud framing — L1
02Metal stud framing — L2
03Hang board — L1
04Hang board — L2
05Tape & finish — L1
06Tape & finish — L2
07Acoustical ceilings
What is a schedule of values?

How DrawPrep fits

  • Fast entry across long SOVs
  • Approved change orders added as their own lines
  • Comparison with prior periods to spot changes

USUAL FIT

Crew plan

Every plan starts with a 14-day free trial.

Compare plans

Drywall & framing billing questions

How detailed should a drywall SOV be?
Detail by floor and operation (frame, hang, finish) helps a GC verify progress. Too much detail adds entry work, so match what your GC expects.
How should rework be billed?
Rework ordered by others is normally billed through an approved change order, not added to base-scope lines.
Can DrawPrep track retainage on this kind of job?
Yes. You set the retainage rate the contract requires, and each pay application carries it forward and flags a rate that changes between periods so you can confirm it before sending.

Related trades

DrawPrep prepares billing packages; it does not submit them, guarantee GC approval or provide legal advice. Confirm stored-material and retainage terms in your contract.