Skip to content

Pay application software for plumbing subcontractors

DrawPrep helps plumbing subcontractors break scope into underground, rough-in, top-out and fixture lines and prepare G702/G703-style pay applications. Inspection records and backup documents stay attached to the period they support.

Billing challenges in plumbing

Inspection-driven milestones

Underground and rough-in are often tied to inspections. Keeping inspection records with the billing makes progress easier to support.

Fixture procurement

Fixtures and specialty equipment may be bought early and stored, which needs its own documentation.

Unit-based jobs

Multifamily work repeats scope across buildings or floors; consistent SOV lines keep that progress readable.

Example schedule of values

Illustrative only. Use the breakdown your contract and GC require.

ItemDescription
01Underground waste & water
02Rough-in — building A
03Rough-in — building B
04Top-out & testing
05Fixtures (material)
06Fixture set & trim
07Water heaters & equipment
What is a schedule of values?

How DrawPrep fits

  • CSV or spreadsheet SOV import
  • Attachments for inspection and delivery records
  • Draft pay apps you can return to mid-period

USUAL FIT

Crew plan

Every plan starts with a 14-day free trial.

Compare plans

Plumbing billing questions

How should a plumbing schedule of values be structured?
Many plumbing contractors organize lines by phase (underground, rough-in, top-out, trim) and by building or floor. Follow any breakdown your GC requires.
Can I attach inspection reports to a pay application?
Yes. You can upload PDFs or images to the project and include them in the downloadable package.
Can DrawPrep track retainage on this kind of job?
Yes. You set the retainage rate the contract requires, and each pay application carries it forward and flags a rate that changes between periods so you can confirm it before sending.

Related trades

DrawPrep prepares billing packages; it does not submit them, guarantee GC approval or provide legal advice. Confirm stored-material and retainage terms in your contract.

YOUR NEXT BILLING PERIOD

Put the paperwork in one place.

Keep the project, the progress and the package together.

Start your workspace